There was a problem with one of the boxes downstream from us that was causing some flooding. That box was cleaned out yesterday and I met with the Clear Creek Crossing HOA people and the Farmers Union ditch manager this morning to confirm that water was flowing properly. It appears that everything is looking good and they should be turning the water up completely on our lateral later today.
We will be scheduling Caron Pump to come get our irrigation system started ASAP. I’ll post as soon as I have a date for that. Thanks for your patience.
Posted on April 16th, 2009 by Dave
Filed under: Out of Date
Leave a Reply